8.3 Explain the robot costing



8.3.1 Discuss briefly about robot costing



      One of the factors to consider is the cost involved in the use of robots. 


      whether the purchase of the robot will result in a change in efficiency, economy and practicality. 

      Companies need to make a detailed study on the cost when planning the use of robots in the production 

      To make sure production can cover the cost of using the system.
 



a. Initial Robot cost



       Also called direct cost


       Divided into 5:

      Robot cost - the cost of the actuator, manipulator, controller, power source and programming systems used by the robot

      End Effectors- it may be the standard that can be purchased at open market or made ​​specifically for certain jobs or tasks. The components in the sensor tip and gripper or other hardware. Typically the cost of the end effector is 3-10% of basic cost robot.

      The cost of additional equipment, it involves a larger memory capacity for
stored-program, computer, monitor, a special panel for the robot controller. box
teach (teach pendent), a special cable to the interface (Interfacing) between all
components and others.

      Training costs for operators and programmers who will use the robot
for operating or production work.

      The cost of support tools to develop a robot cell- for example:

          –      Conveyors
          –      Safety equipments
          –      Other automation components needed
  



b. Installation cost



       Installation work is usually done after the analysis, planning and preparation is made, on the estimated time of the arrival of the robot


       The next action is to give enough time to test all the equipment when the robot arrives later.


       At that point, make sure all equipments received, especially those related to the robot assembly must conform to the standards set for the robot.


       If not, it will cause problems in the future.


       Costs during the installation robot:

       Site preparation, including preparation of the floor and support structure for supporting equipment.

       Installation of basic amenities and communication for robot software for example, wiring and equipment for electrical power will be used during robot operation.

       Interfaces for pneumatic line connections, hydraulic and electrical equipment from the robot to support.

       Robot assembly process and equipment support.

       Transfer and storage processes equipments


       Before installation of the components in the robot system is made, the performance of equipment should be considered.


       Rigid supervision needs to be done and to correct any problems before work is commenced.





       Among the critical examination to be considered during installation are:
 
       Make sure the belting in the robot can maintain the speed when carrying a load and can be adjusted accurately.        

       Make sure the gripper or tool holder can work properly.        

       Make sure that the 'jig' and related equipment can be used correctly